Initial Infra · Virtualisation

Consolidate without creating a new point of failure.

From a single server to a cluster, we design a readable virtual platform sized around real workloads and transferable to your team.

Scope

A platform designed as one complete system.

Workloads · IOPS · RAM · network

Audit & sizing

Workload, dependency, downtime, growth and recovery objectives are mapped before hardware is selected.

Nodes · storage · access

Proxmox installation

Hypervisor, storage, management network and admin permissions configured against an explicit design.

P2V · V2V · rollback

Migration & cutover

Wave plan, compatibility tests and a prepared rollback reduce risk around business applications.

HA · replication · DR

Cluster & continuity

High availability where justified, separate backups and recovery procedures that are actually tested.

Method

Three decisions before the first VM.

01

Qualify

Measure workloads, criticality and cutover constraints.

02

Design

Decide nodes, storage, network, backup and redundancy level.

03

Migrate

Test, move in waves, document and hand over to the team.

Situations to address

When virtualisation becomes a real architecture project.

Installing a hypervisor is not the main difficulty. The real work starts when the platform must remain understandable, recoverable and scalable after cutover.

01

Hardware at end of life

You need to renew one or more servers without reproducing the current sprawl.

02

Licensing or platform change

You want to leave VMware, Hyper-V or an environment that has become too expensive or dependent.

03

Scattered applications

VMs, databases, files and business services have grown without a reliable dependency map.

04

Recovery not properly tested

Backups exist, but nobody knows the exact restore order or achievable recovery time.

Deliverables

You stay in control after go-live.

Initial Infra delivers the project and handover. Initial Ops recurring operations are not open yet, so they are not artificially bundled into this offer.

Architecture diagram and traffic matrix
VM, resource and dependency inventory
Backed-up configurations and transferred access
Cutover, recovery and restore procedures
30-day implementation warranty
Technical handover with your internal owner

Common questions

Decisions to make before choosing the hypervisor.

Is Proxmox always the right choice?+

No. Proxmox is a strong open option, but the decision depends on workloads, available skills, vendor constraints and the recovery scenario. Scope comes before technology.

Do we always need a cluster?+

No. A properly sized single server with separate backup can be more coherent for some SMBs. A cluster is justified when criticality, downtime and budget make redundancy genuinely useful.

Can migration happen without downtime?+

Some workloads can move live, while others require a maintenance window. The migration plan identifies those constraints, prepares testing and documents rollback before cutover.

Are backups part of the project?+

Backup architecture and restore procedures are included in the design. Licences, capacity and any recurring services are priced separately according to the selected scope.

Who operates the platform after delivery?+

Initial Infra documents the platform, transfers access and trains the nominated owner. As Initial Ops is not open yet, no recurring managed service is implicitly included.

Describe the platform to scope

A few details are enough: server or VM count, current hypervisor, cutover constraint and recovery objective.

Your context first

Let's discuss workloads, risk and recovery — not only hypervisors.

A 30-minute first call is enough to determine whether you need one server, a cluster or simply a better-scoped architecture.

Scope my project